A new commercial building in Port Neches needed its underground plumbing roughed in before the slab was poured. Our crew worked the excavated pad, set the drain lines, and brought the stub-outs up in place and marked, so everything sat exactly where the plans called for. Getting this stage right matters, because once the concrete goes down, changes get expensive. The photos show the drain lines and stub-outs in the pad, ready for the pour. Porter's Plumbing Solutions handles commercial drain and sewer work across Port Neches and southeast Texas.
What was wrong
A new commercial building in Port Neches needed its underground plumbing roughed in before the slab was poured.
How we fixed it
Worked the excavated pad, set the drain lines, and brought the stub-outs up in place and marked, ready for the slab pour.